
Empower The Future with an Energy Hub
At Nodriam Energy, we believe in harnessing renewable clean energy and leveraging traditional fuel to shape a sustainable future for generations to come. Thus we are building an integrated energy hub in Eagle Lake, Texas, USA with community and commerce services, designed to deliver exceptional returns.
Eagle Lake Integrated Energy Hub
Eagle Lake Strategic Location
The 10.74-acre site is strategically positioned in a vital logistics corridor just 10 miles from a major Walmart Distribution Center, with verified high-volume traffic.
896
Number of Commercial Trucks per day
4,337
Total Vehicles Per Day (AADT)
10.74
Acres of Land
10 mi.
Nearest Walmart Distribution Center
Integration Pillars
Community & Commerce Hub (Pillars I-V)
A high-traffic, high-margin retail and services destination for professional drivers and the local community.

I.
Gas Station
The primary traffic anchor (Gas & Diesel).

II.
Convenience Store
The main profit engine ("Nick & Moe's" franchise).

III.
Car Wash Service
High-margin recurring subscription revenue.

IV.
Flex Office / Storage
Stable, low-overhead passive income.

V.
Pro Driver Services
Builds loyalty with high-value diesel customers.
Energy & Infrastructure Hub (Pillars VI-VIII)
Long-term, high-value assets that reduce costs, create new revenue, and unlock federal incentives (REAP, IRA, BIL).

VI.
Solar and BESS
~500kW system to cut costs and provide grid services.

VII.
Telecom Tower
Multi-carrier tower for long-term lease revenue.

VIII.
EV Charging Station
4+ DCFC (150kW+) to meet grant goals & build goodwill.
Strategic Partnership
Nodriam Energy has secured a strategic franchise partnership with Nick & Moe's, a proven brand known for its high-quality "Famous Fried Chicken" food program. This partnership is critical to our success:
Operational Support & Godfathering: Provides initial operational oversight, training (62-hour program), and ongoing support, de-risking the Convenience Store / Quick Service Restaurant (QSR) launch.
Proven System: Grants access to a turnkey food service model with a loyal customer following.
High Margins: The high-margin food program is a primary driver of the hub's net profitability.
Job Creation: Creates 15-20 permanent jobs for local residents, fostering community goodwill.

Capital Expenditure (CapEx) and Return-On-Investment (ROI)
Our capital deployment strategy is focused on building high-value, income-generating assets. The table below outlines the estimated CapEx allocation and the projected return on investment timeline for the full build-out.
Asset Category | Estimated CapEx | Primary Revenue Driver | Projected Payback Period |
|---|---|---|---|
Land Acquisition & Prep | $1.2M | Foundation for all Pillars | N/A (Appreciating Asset) |
Fuel & C-Store Construction | $3.5M | Fuel Vol. & Inside Sales | 3-4 Years |
Car Wash Facility | $1.5M | Memberships & Single Washes | 2.5-3.5 Years |
Flex/Storage Units | $0.8M | Rental Income | 4-5 Years |
Solar & Energy Infra | $1.2M | OpEx Savings & Grid Services | 4-6 Years (w/ Incentives) |
Total Project CapEx | $8.2M | Diversified Hub Income | ~4-5 Years (Target) |
Projections
Gross Revenue
$11.8M
NOI
$2.1M
Gross Profit
$3.4M
Net Profit
$1.55M
Revenue Contribution Breakdown
Pillar | Revenue | Cost | Gross Profit |
|---|---|---|---|
Fuel Sales | $6.5M | $6.3M | $0.2M |
C-Store/QSR | $2.8M | $1.6M | $1.2M |
Car Wash | $1.4M | $0.3M | $1.1M |
Flex/Storage | $0.6M | $0.1M | $0.5M |
Other Pillars | $0.5M | $0.1M | $0.4M |
Investment Pathway
We have structured four distinct pathways, offering flexibility to our capital partners. Our preferred, most capital-efficient path is the Phased SBA Launch, which moves us to groundbreaking with the lowest initial equity.
Preferred Pathway
1. Phased SBA Launch
$984,000
Initial equity raise to secure a $4.5M loan package and build the core, cash-flowing assets first.
Accelerated Path
2. Full SBA Launch
~$4.85M
Single equity raise to secure a larger loan and build the entire project in one accelerated phase.
Max Speed / No Debt
3. Phased SBA Launch
~$9.3M
A single 100% equity raise to fund the entire project for the fastest possible timeline to completion.
Max Control
4. Phased Self-Funded
Series of Raises
Fund each construction phase with 100% equity, offering maximum control and a measured pace.
Strategic Vision: Flagship to Consortium
The Eagle Lake project is the blueprint. Our vision is to build a consortium of 3-5 Integrated Hubs, leveraging this profitable and repeatable model to achieve significant economies of scale.
Phase 1: Launch & Stabilize (Yrs 0-2)
Secure funding, build, and stabilize cash flow for the Eagle Lakes flagship project.
Phase 2: Strategic Expansion (Yrs 2-4)
Identify and acquire sites 2 & 3 in new high-growth logistics corridors, targeting Opportunity Zones.
Phase 3: Achieve Scale (Yr 5)
Operate 3-5 hubs, leveraging centralized management, bulk purchasing power, and a unified brand.

